Latest News | Publications | Media


Latest News

Press Release - 26th June 2012


Moyle cable fault

 

At 1012 on Saturday 23rd June a fault occurred on the north cable of the Moyle Interconnector (pole 2) causing it to come off load. Testing has confirmed that the fault is located offshore, approximately 7km from the Scotland converter station in approximately 20m water depth. Pole 1 remains available at 250MW transfer capacity (half the full capacity of the interconnector).

 

-- ENDS –

 

For further press & media information contact Sandra Bolan at Lagan Consulting

 

Tel: 028 9261 9550
Email: sandra.bolan@laganconsulting.com