Transparency

Transparency Data

All fundamental data from 1st October 2013 onwards is published in accordance with the Transparency Guidelines (Reg. (EC) 715/2009, Chapter 3 of Annex 1) on the ENTSOG Transparency platform:

Historical Data
Belfast Stranraer
Moffat Lisburn
Carrick

Balancing Actions

Buys October 2015 – September 2016 (click to download)
Sells October 2015 – September 2016 (click to download)

Published in accordance with Commission Regulation (EU) No. 312/2014

Linepack and Imbalance

Click here to view document 

Transparency Information

The following information is published under and accordance with the requirements of Regulation (EC) No 715/2009.The information is published in respect of the Scotland to Northern Ireland Pipeline and the Belfast Gas Transmission Pipeline, jointly known as the Premier Transmission Pipeline System.

Annex I to Regulation
(EC) 715/2009
Link Further Information
3.1.2 a)
A detailed and comprehensive
description of the different
services and their charges
1. PTL Homepage 1. Home
2. ‘Tariff’
3.1.2 b) u. c) 1.
Different transportation
contracts and other significant
documents
1. Code of Ethics/Business
Conduct

2. Health, Safety &
Environmental Policy Statement

3. Policy On Entry To
Premises Under Statutory
Powers

4. Connection Policy
5. PTL Transportation
Code

6. PTL Accession
Agreement

7. PTL Transportation Code
Modification Rules

8. Belfast Metering
Agreement

9. BGTL- Transportation
Code

10. BGTL Accession
Agreement

11. BGTL Transportation Code
Modification Rules
3.1.2 c)
Network code /
standard conditions
1. PTL Transportation Code
2. BGTL Transportation Code
3.1.2 c) 2.
Specification of
relevant gas quality
parameters
1. Connection Policy
2. PTL Transportation Code
3. BGTL Transportation Code
1. Connection policy
Section 6: Gas quality
and flow measurement
specification.
2. PTL Transportation Code:
Appendix 2- Gas Specification.
7.3 Gas Specification
on entry
8.4 Gas Specification
on exit
3. BGTL Transportation Code:
Section E: Entry
and Exit Requirements
Annex E-1: Gas
Specification
3.1.2 c) 3.
Pressure requirements 1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
Appendix 3- Exit
Point Information
8.3 Offtake Pressure
9.12 Measurement of
offtake pressure
2. BGTL Transportation Code:
Section E 5. Pressure
3.1.2 c) 4.
Procedure in the event
of an interruption of
interruptible capacity
1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
2.5A.6
6. Capacity Reductions and Emergency
2. BGTL Transportation Code:
H Emergencies
3.1.2 d)
Harmonized procedures
applied when using
the transmission system,
including the definition
of key terms
1. PTL Transportation Code
2. BGTL Transportation Code
3.1.2 e)
Harmonized procedures
applied when using
the transmission system,
including the definition
of key terms
1. PTL Transportation Code
2. BGTL Transportation Code
3.1.2 f)
Provisions on capacity
allocation, congestion management
and anti-hoarding and
reutilization procedures
3.1.2 g)
Rules on balancing
and methodology for the
calculation of imbalance
charges
1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
4. Balancing and Scheduling charges
2. BGTL Transportation Code:
Section B 2 Balancing,
scheduling and unauthorised
flow
3.1.2 h)
Flexibility and tolerance
levels included in
transportation and
with additional charges
1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
4.2 Exit Point Tolerance
2. BGTL Transportation Code:
Section B 2 Balancing,
scheduling and unauthorised
flow
3.1.2 i)
Detailed description of the
gas system of TSO and
its relevant points of
interconnection / names of
the operators of the
interconnected systems
or facilities
1. PTL Homepage 1. ‘Doing Business’
3.1.2 j)
Rules applicable for
connection to the system
1. Connection Policy
3.1.2 k)
Information on emergency
mechanisms
1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
6.5 Emergencies
2. BGTL Transportation Code:
Section H Emergencies
3.1.2 l)
Procedures agreed at interconnection points
(if relevant) relating to interoperability
of the network, agreed procedures on
nomination and matching procedures and other
agreed procedures that set out provisions
in relation to gas flow allocations
and balancing
1. NI Capacity Booking
Optimisation Methodology
2. PTL Transportation Code
3. BGTL Transportation Code
1. PTL Transportation Code:
1.5. Daily Capacity Allocations
2. Nominations
3. Allocation
5. Balancing and Shrinkage Gas
8.3 Offtake Pressure
9 Measurement and Testing
2. BGTL Transportation Code:
B1 Capacity, nominations and allocations
B6 Co-ordination with PTL
3.1.2 m)
Description of the methodology
and process used to calculate
the technical capacity
Provision of this information
will follow
3.3. (4), (5)
Capacities, nominations and renominations,
actual physical flows, gross
calorific values
1. Transparency platform
3.3. (1) f)
Planned and actual interruptions
of interruptible capacity
1. PTL Homepage 1. ‘Transparency Information’
3.3. (1) g)
Planned and actual interruptions
of interruptible capacity
1. PTL Homepage 1. ‘Transparency Information’
3.4 (1) u. (2)
Information on secondary trading Not Applicable
3.4 (3)
Balancing services 1. PTL Transportation Code
2. BGTL Transportation Code
1. PTL Transportation Code:
 5. Balancing and Shrinkage Gas
2. BGTL Transportation Code:
B4 Shrinkag
3.4 (4)
Further flexibility service of TSO Not Applicable
3.4 (5)
Amount of gas in the transmission
system and the forecast
1. PTL Homepage
3.4 (6)
User-friendly instruments for
calculating tariffs
1. Tariff 1. ‘Tariff’

This entry was posted in Press releases and tagged , , . Bookmark the permalink.