Assessment of Market Demand for Bi-Directional Capacity at the Moffat Interconnection Point
See publication here
Under both EU and UK law Transmission System Operators (“TSOs”) must endeavour to enable permanent physical capacity to transport gas in both directions ‘bi-directional capacity’, or ‘Physical Reverse Flow’ (“PRF’’) on all interconnections / Interconnection Points (“IP”), except where an exemption from that obligation has been granted from the relevant authorities, after detailed assessment and after consulting in accordance with legislative requirements. PTL, GNI(UK) and National Gas have therefore published this Market Assessment consultation paper to enquire of the market as to the potential demand(s) for bi-directional capacity at Moffat, such that the TSOs can subsequently discharge their obligations in accordance with the relevant legislation. Respondents are invited to respond via the included questionnaire by the 22nd of July 2026.
For information please also see the link to a parallel assessment being conducted by GNI and GNI(UK) in respect of the Gormanston IP.